Construction of Kiseljak Bypass
- Activities
- Design Audit
- Main road
- M5
- Road section
- -
- Canton
- Central Bosnia Canton
Detail Design of the alignment (phase II), tunnel (L= 600 m), section total length L= 1.000 m
Detail Design of the alignment (phase II), tunnel (L= 600 m), section total length L= 1.000 m